What's new

Search results

  1. W

    VMC 650 (chinese machine NEW) Metrol toolsetter

    getting used to this machine, has been a bit more challenging than i remembered. i am also stuggling with getting z set in g54. the machine is metric machine coordinates, and my programs are Imperial units.
  2. W

    VMC 650 (chinese machine NEW) Metrol toolsetter

    I just got back to the machine and the program had the geometry and the wear backwards. i switched the 2200 and 2000 thank you so much
  3. W

    VMC 650 (chinese machine NEW) Metrol toolsetter

    is there any way to look at 5023 in the machine to change the stored position of Z
  4. W

    VMC 650 (chinese machine NEW) Metrol toolsetter

    another issue is I am fairly new to these macro programming, I am unfamiliar with the #2001 #2201. In the program above I was trying to make sense of these numbers and what they are referencing same with #5023
  5. W

    VMC 650 (chinese machine NEW) Metrol toolsetter

    Correct in MDI "G65P9020H1" for example. The machine comes down touches probe, up, slower feed and touches probe a second time, then back to tool change position or Home. I check offsets and is entering the number in wear. I will try your suggestion and see what happens. Thank you
  6. W

    VMC 650 (chinese machine NEW) Metrol toolsetter

    Stefan, I cannot find the TS height routine. I posted the tool setting program above
  7. W

    VMC 650 (chinese machine NEW) Metrol toolsetter

    Thank you for all the help, I think that will help with issue 1. Here is the macro supplied, and I cannot make sense of it. thank you for any help It is greatly appreciated. O9020(Metrol AUTO-TOOL-LENGTH-MEASUREMENT For Mitsubishi) #510=596.750(X-axis Machine Coordinate) #511=-140.50(Y-axis...
  8. W

    VMC 650 (chinese machine NEW) Metrol toolsetter

    Issues with getting the Machine setup, Machine was delivered with tool setting probe on top of the 4 axis. I have relocated it to the table. about a 9" difference. The machine is running Fanuc OI MF. Macro program works and I have relocated the X&Y for the new probe position. Issue 1 when I...
Back
Top