Nithishtk91
Plastic
- Joined
- May 18, 2013
- Location
- Coimbatore,TN,INDIA
HI , am from india, and me and my dad run 2 machine shop with Vtl's, HBMs,RDM,HMC's,VMC and a CMM etc.. my dad runs it old school, but he has everything stored in his head he always remembers scheduled date,he also quote for job by just seeing the drawing for a minute. then i stepped in i couldn't figure out whats happening. i couldn't track the jobs so i came up with a WORK FLOW SHEET . which is a simple spreadsheet, using the drive app on G mail, i assigned people to fill that sheet with name , drwng no, dc no ,dc date these detail will be filled by a guy who prepared DC , so every time a material comes in this guys fill enter the detail in the sheet , then come the production part , in that production guy will fill the production details like , turining, milling,drilling,CNC,inspection,testing,Packing , this will be filled with color code like green for complete , red for breakdown, yellow for on process, blue for waiting, after completion for despatch the Guy who puts the Dc will put the DC closing date and closed the job . even we comment on the specific cells on spreadsheet to communicate , say is production guy put red on the inspection part , he add a comment saying reason for breakdown ....
This how we control and monitor the work flow in my Shopfloor
This how we control and monitor the work flow in my Shopfloor